Plan fill dirt quantities for grading, depressions, and excavations in cubic yards or tons, including the expected settling.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches

Fill dirt may settle 10 to 15% after it is placed. Ordering only the amount measured in the excavation can leave you an inch or two short after the first heavy rain, so the calculator includes a 10% settling allowance. A dry cubic yard weighs about 2,400 lb, or 1.2 tons, and material is sold in yards. For planting areas, use topsoil instead; see the separate topsoil calculator.

How to measure fill work

  1. Measure the length and width of an area in feet, then multiply by the average height you need to build up. For an uneven low spot, check the deepest spot and the shallow outer edge, then use the midpoint between them.
  2. Measure each void in feet, then multiply its depth by its width and length for holes or trenches.
  3. To change cubic feet into yards, divide by 27. For tons, multiply the yard total by 1.2, and keep the settling allowance selected.
Cubic yards = (Area sq ft × Average depth in ÷ 12) ÷ 27
Tons = cubic yards × 1.2 · +10% for settling is on by default

Coverage and material weight

MaterialWeight per cubic yardTons per yard
Fill dirt (dry)≈ 2,400 lb1.20
Fill dirt (wet)up to 3,000 lb1.50
Topsoil, for comparison≈ 2,200 lb1.10
Depth of fill1 cubic yard covers5 yards cover
2 inches162 sq ft810 sq ft
4 inches81 sq ft405 sq ft
6 inches54 sq ft270 sq ft
12 inches27 sq ft135 sq ft

Typical fill projects and yard amounts

ProjectTypical sizeDepthVolumeWeight
Raise a low lawn area20 x 20 ft4"4.9 yd³5.9 tons
Level a settled depression15 x 15 ft, avg 6"6"4.2 yd³5 tons
Backfill a utility trench25 ft x 2 ft18"2.8 yd³3.3 tons
Build a landscape berm20 x 6 ft12"4.4 yd³5.3 tons
Backfill along a foundation60 ft x 2 ft10"3.7 yd³4.4 tons

Fill dirt explained and when not to use it

Fill dirt comes from the mineral subsoil below the active topsoil and is screened free of rock and debris. Its limited organic content is intentional: organic material breaks down and drops, while low-organic structural fill is more likely to hold its grade. Use it for berms, backfilled trenches, filled holes, and grade adjustments. Areas for grass or vegetables need 4-6 inches of topsoil on top of the fill, so reserve topsoil for that upper growing layer.

Plan for settling before ordering

With dirt, settlement often means ordering another load for the same excavation. Place it in 6 to 8 inch lifts, compacting each lift. If compaction is not available, soak every lift well and give it time to settle. For lawn patches, finish roughly a half-inch above grade so the surface settles even. Beneath slabs or footings, deep structural fill needs thinner, equipment-compacted lifts that meet the engineer's specification. Keep organics out of the fill, since wood buried below grade can decay and create a sinkhole five years later.

How wet conditions affect fill orders

Wet weather changes the weight of fill, not the amount you need to order. It can change the work plan, since saturated material smears instead of packing and makes wheelbarrow work unpleasant. Try to set delivery for dry weather. Keep the pile elevated, where it will shed much of the rain, and cover it when storms approach so it is ready to spread sooner.

Fill dirt answers for common projects

How many yards of dirt are needed?
Multiply the square-foot area by the average fill depth in feet, then divide the result by 27. For a 20 x 10 area lifted 6 inches, the result is 3.7 cubic yards. Including the 10% settling amount, order 4.
What does a yard of fill dirt weigh?
A dry cubic yard weighs about 2,400 lb, equal to 1.2 tons. Once wet from rain, that same yard may exceed 3,000 lb, which is more relevant for wheelbarrow loads than for placing an order.
What does fill dirt mean?
It is screened subsoil with low organic content. It packs into a firm layer for changing grades, rather than serving as planting soil.
How do fill dirt and topsoil compare?
Use fill dirt for the structural layer and topsoil as the growing layer. Bring fill to 4-6 inches below final grade, then add topsoil wherever plants will grow. Planning for the difference between the materials helps control the project cost.
How much fill goes in a hole?
Multiply the length, width, and depth in feet, then divide the result by 27. For example, a 4 x 4 ft hole that is 3 feet deep contains 48 cubic feet, or roughly 1.8 yards. Add dirt in layers and compact them as you go; the 10% allowance accounts for settlement.
Where do I get fill dirt?
The calculator takes you to the Fill Dirt product page, where material is priced by the yard and delivered free across Delaware. "Free fill" from classified ads is often uneven and unscreened, and debris removal can use up any dollars saved.
How much dirt fits in a dump truck?
A single axle truck carries 8 to 10 yards, while a tandem carries 12 to 16. You may order less than a full truckload, and delivery is free regardless of quantity.
Should fill dirt be compacted?
Compact fill that will carry weight, using 6-8 inch lifts. On lawn repairs, soak the material well and leave it a half-inch high to settle level without equipment.

Fill dirt ordering and delivery.

Screened fill dirt for grading and backfill, with delivery across Delaware.

Shop Fill Dirt

Order aggregate matched to your calculator result