Skip to main content
FREE Delivery!|(302) 406-2968

Road base calculator for Delaware

Tonnage for lanes and pads at finished compacted depth, where several inches can add ten tons to an order.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches

At 6 inches of compaction, a 100-foot lane that is 10 feet wide takes about 31 tons of road base. Lane volumes add up quickly, and free delivery is most useful here because hauling 30 tons can normally approach the price of the stone. Road base combines graded crushed stone with fines, weighing about 3,000 lb per cubic yard, and compacts into a dense bearing layer for driveways, roads, and equipment yards. Recycled crushed concrete base follows the same calculation when permitted by the specification.

Lane calculations

  1. For a lane, measure along its centerline and work from the average width. For pads, multiply the length and width.
  2. Use a compacted depth of 4 inches for light residential use, 6 for daily traffic and delivery trucks, and 8-12 beneath equipment or across soft subgrades.
  3. Divide cubic feet by 27 for yards, then x 1.5 for tons, with +10% included for compaction.
Tons = (Length ft × Width ft × Depth in ÷ 12) ÷ 27 × 1.5 × 1.10
Quick figure: one ton ≈ 36 sq ft at 6" compacted

Lane coverage and tonnage

Compacted depth1 ton coversTons per 100 ft of 10-ft lane
4 inches≈ 54 sq ft20.4
6 inches≈ 36 sq ft30.6
8 inches≈ 27 sq ft40.7
12 inches≈ 18 sq ft61.1

A lane built for another winter

  • First remove all organic material. Putting base on topsoil lets mud work upward through the stone, regardless of the depth placed.
  • Where the subgrade is wet or weak, place woven geotextile before the stone. It provides economical added support for a lane.
  • Install material in lifts no greater than 4 inches, rolling each one before placing another.
  • Build a 2-3% crown from the centerline to each edge, allowing rain to drain off rather than enter the base.
  • For a finished driving layer that stays neat and limits dust, cap the base with #57 or driveway gravel.
  • Hand-spreading 20-plus tons can consume a week. Include a skid steer or tractor box blade in the plan, since either can place the material within an afternoon.

Example: a 100-foot farm lane

At 6 inches, one hundred by ten feet equals 1,000 x 0.5 = 500 cubic feet = 18.5 cubic yards, or about 28 tons, rising to 30-31 with the allowance. Expect two tandem loads, and arrange two drop points along the lane instead of a single pile at the entrance. For farm lanes, separate drops can reduce the distance material must be moved during spreading.

Pads for RVs, containers, and equipment

Use the lane formula for pads, but select depth for axle load rather than the calendar. A 12 x 40 RV pad at 6 inches compacted requires about 12 tons. For a 20 x 40 equipment yard at 8 inches, allow 27. Because shipping containers place their load at four corners, provide container pads with a full 8 inches plus fabric even on decent ground, or their corners may mark the pad by spring.

Road base made from crushed concrete

For private pads and lanes, recycled concrete base is often a practical alternative to virgin road base, compacting and carrying loads similarly while frequently costing less. Review county requirements first, since some specify virgin aggregate. The estimate remains the same: 1.5 tons per yard, with the same lift depth and crown.

Road base by ton for lane projects

How do I calculate the road base quantity?
Use the compacted depth in feet: multiply it by length and width in feet, then divide the result by 27 for yards. Multiply yards by 1.5 for tons and include 10% for compaction. That allowance is already applied in the calculator above.
What area will 1 ton of road base cover?
At 4 inches compacted, expect about 54 square feet; at 6 inches, about 36 square feet.
What is the weight of 1 yd of road base?
A loose yard weighs roughly 3,000 lb, equal to 1.5 tons, with greater density after rolling. Per trip, a tandem truck holds about 10 yards, or 15 tons.
What road base depth is needed for a driveway?
For light traffic on firm ground, specify Four inches after compaction. Allow Six for routine vehicles and delivery trucks. Where clay, wet soil, or parked equipment is present, use Eight to twelve. Increase base depth before increasing width, since insufficient depth fails sooner.
Road base versus crusher run
These materials fill much the same role. Road base uses a larger top stone for load support; crusher run is finer and grades more smoothly. Use road base for yards and lanes, and crusher run for paver bases or close grading. For a standard driveway, let price guide the choice.
Is fabric required below road base?
Fabric is not needed on firm, drained subgrade. Use woven geotextile between the soil and stone on clay or in areas that have developed ruts; it limits mixing and can reduce by half the stone a lane uses over a decade.

Zero delivery fees on Thirty tons.

At lane-scale quantities, road base is sold by the ton with free hauling, where transport often accounts for the greatest cost.

Shop Road Base

Order aggregate matched to your calculator result